Home/Solar installation in Eldoret
Eldoret

Solar installation in Eldoret and the North Rift

Eldoret's businesses, farms, schools and family homes all pay rising Kenya Power bills and lose time to outages. We install across Uasin Gishu and the North Rift, sized to how you actually use power.

Updated 10 October 2026

Who we install for in Eldoret

  • Businesses in town. Shops, carwashes, salons, hotels and workshops use most of their power in daylight, which is when solar generates. They see the fastest payback. See solar for business.
  • Farms. Water pumping, milk cooling and lighting for livestock all benefit from cheap daytime power and backup through outages.
  • Schools and colleges. Daytime classes line up with generation; a battery keeps evening study lights on.
  • Family homes in Elgon View, Kapsoya and the growing estates around town.

Things to plan for

  • Highland weather. Cool, bright days are good for panel efficiency; the wetter months produce less. We size against the cloudiest month so the system carries a dull week.
  • Heavy machinery. Mills, welders and large motors need a site-specific design. Our standard systems run from 5 to 15 kWh; for larger loads we start with an energy audit and design to your site.
  • Power quality. If equipment trips or lights flicker, measure the supply before sizing. We can carry out a power-quality survey as part of our consultancy work.

Prices

System prices are the same as everywhere in Kenya: KSh 289,000 (5 kWh), KSh 349,000 (7.5 kWh, our most popular), KSh 429,000 (10 kWh) and KSh 599,000 (15 kWh), installed, with a lithium battery and no VAT. Transport and travel are quoted in writing at survey, before you commit. Monthly plans run over 12, 24 or 36 months. Full details are on our solar prices page.

How it works in Eldoret

  1. Send your bill. Share your last Kenya Power bill on WhatsApp, or use the savings calculator. You get a written estimate within 24 hours.
  2. Survey. We arrange a site survey to check your roof, shade, wiring and the loads you run, and give you the transport figure in writing.
  3. Written quote. Every component itemised, one installed price, and the monthly output we guarantee.
  4. Installation by our own technicians, usually one day on site.
  5. Commissioning with a metered output reading that becomes your performance guarantee. Faults are acknowledged within 24 hours and attended within 72.

Where we install

  • Eldoret town
  • Elgon View
  • Kapsoya
  • Langas
  • Pioneer
  • Annex
  • Moi's Bridge
  • Turbo
  • Burnt Forest
  • Iten
  • Kitale
  • Kapsabet

Uasin Gishu, Elgeyo-Marakwet, Trans-Nzoia and Nandi counties, and all 47 counties nationwide. Transport quoted at survey.

Common questions

Do you install solar in Eldoret?

Yes. We install across Uasin Gishu and the North Rift, including Iten, Kitale, Kapsabet and Turbo. System prices are the same as in Nairobi; transport is quoted in writing at survey.

Can you install solar for a farm or school near Eldoret?

Yes. Farms and schools use most of their power in daylight, which suits solar well. Standard systems run from 5 to 15 kWh, and larger loads get a site-specific design after an energy audit.

Can I pay for solar monthly in Eldoret?

Yes. In-house financing over 12, 24 or 36 months is available everywhere we install, with a 30% deposit on 12 and 24 months and 40% on 36 months.